Multimodal transportation - transportation of goods under one contract, but performed by at least two types of transport (road, sea, rail, etc.), where the forwarder is responsible for the entire delivery process.
Service list:
Organization of cargo delivery from several factories by road;
Consolidation of cargo in a warehouse (Germany, Finland, the Baltic States or the Russian Federation) before shipment by sea or by rail;
Complex of services for multimodal transportation of equipment for the oil refining industry.
Cargo: Unit for isomerization of pentane-hexane fraction
The largest product: Column - 67 meters long, 6 meters in diameter, gross weight - 186 tons.
The cargo party (including the Column - 67 meters long) was delivered by road from factories in Spain to the port of Bilbao for loading onto a sea-river vessel.
The equipment was delivered to the port of Astrakhan by water transport, from where it was delivered to the consignee by road.
Назад
THE NETHERLANDS → SALEKHARD, RUSSIA
MULTIMODAL TRANSPORTATION, 2020
In July, 2013 a range of services was provided for multimodal transportation of power equipment for TPP "Polyarnaya" along the route: Port of Venlo, the Netherlands - Port of Antwerp - Port of St. Petersburg - DAP Salekhard, turbine hall of TPP "Polyarnaya"
Cargo: Gas Turbine Generator Set
Total weight of the transported equipment: 877.5 tons.
The following services were provided: - River freight Venlo - Antwerp; - Loading and unloading operations in the port of Antwerp; - Sea freight Antwerp port - St. Petersburg port; - Unloading from a sea vessel in the port of St. Petersburg; - Storage for 2 months in the port of St. Petersburg; - Preparation and approval of schemes for stowage and securing of cargo on the barge vehicles used to transport cargo to the port of Salekhard; - Loading on a barge in the port of St. Petersburg; - River and sea delivery St. Petersburg - Salekhard, including approval and obtaining permission for passage through the Northern Sea Route; - Development and manufacture of special reinforcements; - Construction of a berth in Salekhard for unloading from RO-RO barges; - Organization of loading and unloading operations at the berth in Salekhard; - Check of the road delivery route to Salekhard; - Obtaining permits for transportation in Salekhard; - Auto delivery from the unloading berth to the site in the turbine hall of the "Polyarnaya" TPP; - Unloading at TPP "Polyarnaya"; - Survey of the cargo.
Назад
SEA PORT OF SAINT PETERSBURG → MOSCOW OBLAST
MULTIMODAL TRANSPORTATION, 2013
In July, 2013 an LR 1300 crane was transported by road from St. Petersburg to Moscow.
Weight of the cargo party of equipment: 2,500 tons.
Heavyweight and oversized places: 1) Caterpillars - 72 tons each; 2) Tower part - 48 tons.
The following services were provided: - Organization of loading, unloading and forwarding in the port of St. Petersburg; - Supply of the necessary railway wagons for transportation in a short time; - Trucking from the port of St. Petersburg to the Moscow Oblast; - Monitoring of the cargo movement throughout the entire route.
After customs clearance all cargo was delivered by 119 vehicles within 8 days.